The budget of the Cycle Track was set at $7,100,0001. The current spending according to the City of Calgary has been , which is of the cycle track budget
If you look at the trips done over the lifespan of the cycle track pilot project, you can see that this comes to $ spent per trip.
When the pilot started, the average collisions per year was . Since the track has been put in place, there is now 1. Assuming a cost to the city of 2, this comes to a savings of $ per year.
Assuming airport tunnel construction costs came to 2. Assuming the same dollar-per-trip construction value,3 you would see trips, or roughly trips/day.4